Project Scope
This project involved an overlay installation. The original roof was composed of SIPs panels attached to purlins, and the most efficient solution was to overlay it with 100mm PIR insulation board, followed by Viking 1.5mm Enviroclad TPO membrane. This not only resolved the roofing problem but also significantly improved the building’s insulation. To ensure the work could proceed in any weather, the entire roof was covered with scaffold wrap, allowing the project to continue uninterrupted.
SPECS
1,240m² of Viking Roofspec Warm Roof and Enviroclad TPO Membrane
630m² of Viking Roofspec Enviroclad TPO Membrane to Opium
Contracted by
McMillan & Lockwood BOP Ltd