Project Scope
From the very start, we were thrilled to be part of this project, which was completed in two stages. Stage one began at the Pack n Save building, extending along the western side of the site and continuing down the northern side to the Warehouse. This stage featured a built-up roofing system with multiple layers of underlay, insulation, and galvanized Z rails as part of the roof assembly.
Stage two covered the northern side from the Warehouse, including the Event Cinema and additional retail spaces. For the cinema, we utilized a clip-fixed system to accommodate thermal expansion due to the length of the roofing sheets.
SPECS
45,000m² of Dimond Roofing and Wall Cladding
2,500 m² of Ardex Membrane Gutters
Contracted by
Hawkins 2017 Ltd