Project Scope

This was our first installation of the Roof Logic system, and we haven’t looked back since. The speed and efficiency of achieving 90% waterproofing in such a short time is remarkable. The process starts with installing either a liner or base deck directly over the purlins, which is done quickly. Then, a peel-and-stick vapor control layer is applied, making the roof almost fully watertight. This allows construction to continue comfortably below while we work above, without any concerns about health & safety issues.

SPECS

1,000m² of RoofLogic Insulated Roofing

Contracted by

Marra Construction (2004) Ltd